Items List

Clear

Recent RFI Items

  • B2 - SED components

    Please clarify how NZBC B2 has been considered for the SED works. Attaching a letter in lieu to the PS1 is one way to resolve the matter.

    Created 1 year ago

  • G4 - Extractor fans

    Please clarify how extractor fans required in areas containing cooktops, showers and baths will achieve an adequate flow rate per second, and identify the extraction path to demonstrate the compliance with NZBC Clause G4.3.3 & G4.3.4.

    Created 1 year ago

  • E2 - Roof underlay

    Please provide the product spec for the proposed roofing underlay.

    Created 1 year ago

  • B1 - Outrigger

    Please clarify how gable end raking verge will be constructed, information should be provided for outrigger/ cantilevered purlins to show compliance with NZS3604:2011 Section 10.

    Created 1 year ago

  • B1 - Foundation - shower rebate

    Please clarify how reinforcement details in the shower rebate detail will comply with your nominated means of compliance for NZBC Clause B1.

    Created 1 year ago

  • B1 - Lintel fixing

    Please provide the lintel fixing information to show compliance with NZBC Clause B1.

    Created 1 year ago

  • E2 - Head flashing

    Please specify on the drawing that sealant must be installed between the head flashing and window flange in VH and EH wind zones.

    Created 1 year ago

  • B1 - Roofing

    Please clarify the fixing pattern for roof cladding to show compliance with NZBC Clause B1.

    Created 1 year ago

  • E1 - Outfall

    The PIM report indicates that stormwater infrastructure is not available for this site. Please provide further information to demonstrate that surface water will be discharged to a suitable outfall on-site, e.g. soak pit.

    Created 1 year ago