Items List
Recent RFI Items
-
G4 - Extractor fans
Please clarify how extractor fans required in areas containing cooktops, showers and baths will achieve an adequate flow rate per second, and identify the extraction path to demonstrate the compliance with NZBC Clause G4.3.3 & G4.3.4.
Created 10 months ago
-
E2 - Roof underlay
Please provide the product spec for the proposed roofing underlay.
Created 10 months ago
-
B1 - Outrigger
Please clarify how gable end raking verge will be constructed, information should be provided for outrigger/ cantilevered purlins to show compliance with NZS3604:2011 Section 10.
Created 10 months ago
-
B1 - Foundation - shower rebate
Please clarify how reinforcement details in the shower rebate detail will comply with your nominated means of compliance for NZBC Clause B1.
Created 10 months ago
-
B1 - Lintel fixing
Please provide the lintel fixing information to show compliance with NZBC Clause B1.
Created 10 months ago
-
E2 - Head flashing
Please specify on the drawing that sealant must be installed between the head flashing and window flange in VH and EH wind zones.
Created 10 months ago
-
B1 - Roofing
Please clarify the fixing pattern for roof cladding to show compliance with NZBC Clause B1.
Created 10 months ago
-
E1 - Outfall
The PIM report indicates that stormwater infrastructure is not available for this site. Please provide further information to demonstrate that surface water will be discharged to a suitable outfall on-site, e.g. soak pit.
Created 10 months ago
-
General - Ground condition
Council’s knowledge based on what has been discovered on sites in the locality suggests that this site may have suspect bearing capability. Please provide a Geotech report. Please note that the foundation is not able to be assessed until the Geotech report is received.
Created 10 months ago