General - Ground condition
Council’s knowledge based on what has been discovered on sites in the locality suggests that this site may have suspect bearing capability. Please provide a Geotech report. Please note that the foundation is not able to be assessed until the Geotech report is received.
Created 1 year ago
-
E1 - Paved patio
Please demonstrate how surface water from the paved surface will be discharged in a way that protects other property from the adverse efects of surface water to show compliance with NZBC Clause E1.3.1
Created 1 year ago
-
H1 - Ceiling Insulation
When full-thickness insulation cannot be installed due to roof space restrictions, the roof R-Value could be reduced to R3.3 for a distance up to 500mm from the outer edge of the ceiling perimeter. You proposed design does not clearly demonstrate the compliance with the schedule method for ceiling perimeters. Please provide further information to show compliance with NZBC Clause H1.
Created 1 year ago
-
D1 - Landing
Please indicate the maximum height from the sliding doors to the ground/ landing to show compliance with NZBC Clause D1.3.3.
Created 1 year ago
-
General - S37
There is a S37 as per the PIM. Please contact the planning team for more detail.
Created 1 year ago
-
C - Downlights
Please clarify the rating of the recessed downlights to show compliance with the NZBC C clauses.
Created 1 year ago
-
B1 - Ceiling diaphragm
A metal angle is required for the ceiling diaphragm applied to the raking ceiling for the scissor trusses.
Created 1 year ago
-
B1 - Top plate connection for bracing wall
NZS3604:2011 Section 8.7.3.4 requires bracing walls to be connected at the top plate level. Connect to at least two external walls is required when the total bracing capacity exceeds 125 Bus. Please demonstrate how the top plate will be extended to the external walls across the scissor truss areas.
Created 1 year ago