  • G12 - Water supply

    Please clarify the proposed means of potable water supply, as the PIM report indicates that Council water supply is not available for this property.

    Created 11 months, 4 weeks ago

  • E1 - Stormwater outfall

    The PIM report indicates that there is no public stormwater network available to serve this property. Please demonstrate how stormwater will be managed on-site.

    Created 1 year ago

  • E3 - Water splash floor

    Please demonstrate how the tiled flooring will satisfy the requirements of NZBC Clause E3. E3/AS1 requires tiles to be laid on a continuous impervious substrate or membrane, and the edges of the tiled area must be sealed or coved in areas where water splash may occur.

    Created 1 year ago

  • H1 - Roof insulation

    Full-thickness insulation cannot be fitted due to roof space restrictions near the ceiling perimeter. Your H1 calculation report and ceiling R-value assessment do not specify the R-value for the ceiling perimeter.

    Created 1 year ago

  • B1 - Ceiling batten

    Bottom chord restraint is required when the metal ceiling batten is mounted on clips. Please clarify which installation method will be used for the Rondo ceiling battens.

    Created 1 year ago

  • General - Datum

    Site-specific datum/level is required. The datum/level needs to be referenced to a fixed point on-site or to a recognized datum.

    Created 1 year ago

  • General - Incomplete subdivision

    Incomplete subdivision as outlined in the PIM report. The owner will be required to indemnify Ashburton District Council of any liability created by the non-issue of a legal title through whatever reason. The owner should take legal advice before commencing any construction work associated with the Building Consent.

    Created 1 year ago

  • E1 - Finished floor level (FFL)

    Please provide a note to ensure that E1/AS1 Para 2.0.1 will be achieved, as there are no references indicating the site's elevation relative to the road crown level.

    Created 1 year ago

  • E3 - WPM

    Please provide the product spec for the undertile waterproofing membrane system.

    Created 1 year ago