Items List
Recent RFI Items
-
B1 - Ceiling batten
Bottom chord restraint is required when the metal ceiling batten is mounted on clips. Please clarify which installation method will be used for the Rondo ceiling battens.
Created 6 months, 1 week ago
-
General - Datum
Site-specific datum/level is required. The datum/level needs to be referenced to a fixed point on-site or to a recognized datum.
Created 6 months, 1 week ago
-
General - Incomplete subdivision
Incomplete subdivision as outlined in the PIM report. The owner will be required to indemnify Ashburton District Council of any liability created by the non-issue of a legal title through whatever reason. The owner should take legal advice before commencing any construction work associated with the Building Consent.
Created 6 months, 1 week ago
-
E1 - Finished floor level (FFL)
Please provide a note to ensure that E1/AS1 Para 2.0.1 will be achieved, as there are no references indicating the site's elevation relative to the road crown level.
Created 6 months, 2 weeks ago
-
E3 - WPM
Please provide the product spec for the undertile waterproofing membrane system.
Created 6 months, 2 weeks ago
-
B2 - SED components
Please clarify how NZBC B2 has been considered for the SED works. Attaching a letter in lieu to the PS1 is one way to resolve the matter.
Created 6 months, 2 weeks ago
-
G4 - Extractor fans
Please clarify how extractor fans required in areas containing cooktops, showers and baths will achieve an adequate flow rate per second, and identify the extraction path to demonstrate the compliance with NZBC Clause G4.3.3 & G4.3.4.
Created 6 months, 2 weeks ago
-
E2 - Roof underlay
Please provide the product spec for the proposed roofing underlay.
Created 6 months, 2 weeks ago
-
B1 - Outrigger
Please clarify how gable end raking verge will be constructed, information should be provided for outrigger/ cantilevered purlins to show compliance with NZS3604:2011 Section 10.
Created 6 months, 2 weeks ago