Items List

Clear

Recent RFI Items

  • E1 - Stormwater outfall

    The PIM report indicates that there is no public stormwater network available to serve this property. Please demonstrate how stormwater will be managed on-site.

    Created 9 months, 3 weeks ago

  • E3 - Water splash floor

    Please demonstrate how the tiled flooring will satisfy the requirements of NZBC Clause E3. E3/AS1 requires tiles to be laid on a continuous impervious substrate or membrane, and the edges of the tiled area must be sealed or coved in areas where water splash may occur.

    Created 9 months, 3 weeks ago

  • H1 - Roof insulation

    Full-thickness insulation cannot be fitted due to roof space restrictions near the ceiling perimeter. Your H1 calculation report and ceiling R-value assessment do not specify the R-value for the ceiling perimeter.

    Created 9 months, 3 weeks ago

  • B1 - Ceiling batten

    Bottom chord restraint is required when the metal ceiling batten is mounted on clips. Please clarify which installation method will be used for the Rondo ceiling battens.

    Created 10 months ago

  • General - Datum

    Site-specific datum/level is required. The datum/level needs to be referenced to a fixed point on-site or to a recognized datum.

    Created 10 months ago

  • General - Incomplete subdivision

    Incomplete subdivision as outlined in the PIM report. The owner will be required to indemnify Ashburton District Council of any liability created by the non-issue of a legal title through whatever reason. The owner should take legal advice before commencing any construction work associated with the Building Consent.

    Created 10 months ago

  • E1 - Finished floor level (FFL)

    Please provide a note to ensure that E1/AS1 Para 2.0.1 will be achieved, as there are no references indicating the site's elevation relative to the road crown level.

    Created 10 months ago

  • E3 - WPM

    Please provide the product spec for the undertile waterproofing membrane system.

    Created 10 months ago

  • B2 - SED components

    Please clarify how NZBC B2 has been considered for the SED works. Attaching a letter in lieu to the PS1 is one way to resolve the matter.

    Created 10 months ago