Recent RFI Items

  • F2 - Safety glazing

    Please clarify how the safety glazing will comply with NZBC Clause F2.3.3

    Created 6 months ago

  • E1 - Paved surface

    When the paved area slopes toward the boundary, it must leave sufficient gap between the boundary and the paved surface to prevent causing any nuisance to the neighbouring property.

    Created 6 months ago

  • C - Intertenancy FRR

    Please clearly show where the FRR system terminates, including the FRR extended to the soffit.

    Created 6 months ago

  • B1 - Truss fixing

    Please make sure all truss fixings are specified in the truss document, including gable end trusses.

    Created 6 months ago

  • B1 - Dwangs

    Please confirm the dwang spacing for timber wall framing as shown on the drawings.

    Created 6 months ago

  • G12 - Water supply

    Please clarify the proposed means of potable water supply, as the PIM report indicates that Council water supply is not available for this property.

    Created 6 months ago

  • E1 - Stormwater outfall

    The PIM report indicates that there is no public stormwater network available to serve this property. Please demonstrate how stormwater will be managed on-site.

    Created 6 months, 1 week ago

  • E3 - Water splash floor

    Please demonstrate how the tiled flooring will satisfy the requirements of NZBC Clause E3. E3/AS1 requires tiles to be laid on a continuous impervious substrate or membrane, and the edges of the tiled area must be sealed or coved in areas where water splash may occur.

    Created 6 months, 1 week ago

  • H1 - Roof insulation

    Full-thickness insulation cannot be fitted due to roof space restrictions near the ceiling perimeter. Your H1 calculation report and ceiling R-value assessment do not specify the R-value for the ceiling perimeter.