B1 - Bracing calculation
When the roof pitch is greater than 25°, roof dimensions should be used to calculated the wind bracing demand. Please refer to NZS3604:2011 Section 5.2.6.
Created 11 months, 2 weeks ago
-
B2 - Concrete strength
Please clarify the concrete strength for the foundation system to demonstrate the compliance with NZBC Clause B2.
Created 11 months, 2 weeks ago
-
E2 - Cavity batten compatibility
CCA treated (H3.2) cavity battens should be avoided in direct contact with metal cladding. Please refer to E2/AS Table 21.
Created 11 months, 3 weeks ago
-
C - SFH fireplace
Please demonstrate how the proposed fireplace location will maintain sufficient clearance from the curtains to ensure compliance with NZS 2918:2018.
Created 11 months, 3 weeks ago
-
G13 - Holding tank
FYI - The owner must have a maintenance contract signed after the holding tank system is installed prior to CCC issued or occupancy.
Created 11 months, 3 weeks ago
-
G13 - Effluent discharge
Please demonstrate that the proposed effluent discharge will comply with Rule 5.8 or provide the resource consent obtained from ECAN.
Created 11 months, 3 weeks ago
-
G13 - On-site effluent system
Please provide the supporting documents for the on-site effluent system.
Created 11 months, 4 weeks ago
-
E2 - Chimney cricket flashing
Please provide flashing details of the cricket at the chimney penetration to demonstrate how compliance with NZBC Clauses E2.3.1 and E2.3.2 will be achieved.
Created 11 months, 4 weeks ago
-
F1 - Contaminated site (HAIL)
HAIL activities were found on the ECAN LLUR. Please provide further information demonstrate how remedial work will be provided to show compliance with NZBC Clause F1.3.2.
Created 11 months, 4 weeks ago