G13 - Holding tank
FYI - The owner must have a maintenance contract signed after the holding tank system is installed prior to CCC issued or occupancy.
Created 6 months ago
-
G13 - Effluent discharge
Please demonstrate that the proposed effluent discharge will comply with Rule 5.8 or provide the resource consent obtained from ECAN.
Created 6 months ago
-
G13 - On-site effluent system
Please provide the supporting documents for the on-site effluent system.
Created 6 months ago
-
E2 - Chimney cricket flashing
Please provide flashing details of the cricket at the chimney penetration to demonstrate how compliance with NZBC Clauses E2.3.1 and E2.3.2 will be achieved.
Created 6 months ago
-
F1 - Contaminated site (HAIL)
HAIL activities were found on the ECAN LLUR. Please provide further information demonstrate how remedial work will be provided to show compliance with NZBC Clause F1.3.2.
Created 6 months ago
-
F2 - Asbestos
Please confirm if a site visit has been conducted and provide further comments regarding the potential presence of asbestos.
Created 6 months ago
-
E2 - Valley gutter
Please provide an asymmetrical valley gutter detail for the different roof pitch to show compliance with NZBC Clause E2.
Created 6 months ago
-
B1 - Roof bracing
Please demonstrate how roof bracing will comply with NZS3604:2011 section 10.
Created 6 months ago
-
D1 - Slip resistance
Please clarify how the access route will achieve the slip resistance requirement in accordance with NZBC Clause D1.3.3(d). For guidance, please refer to D1/AS1 Table 2.
Created 6 months ago